- manufacturer
- G-TEAM + SIEMENS
- Manufacture Date
- 2000
- Description
- Backpressure turbine: G-TEAM, 2,9 Mpa, 380°C, 18 t/h, back pressure 1,4 Mpa Turning reduction device: 17 000 to 3000 RPM, a Generator: SIEMENS, type: ARN 560Y-2Ge, asynchronous, 1120kW Oil type: TB 46 Full operation: 2004 - 2010 (turbine replacement in 2006) Stored within warehouse: 2010 - until now Whole documentation with pasport, technical lists, certificates of quality and operation instructions can be sent upon request.
- by order of:
- NetBid Industrie-Auktionen AG
*** ended *** G-TEAM + SIEMENS Backpressure turbine with a generator and auxiliary systems (regulation valves, lubrication system, etc.) on frame
PreviousAuction Type
Online Auction- ends:
- 01/10/2018
08:00 - number of bids:
- 0 Bids
- Status:
- Auction closed
- Item no.:
- X14522-1
- surcharge
- %
Backpressure turbine with a generator and auxiliary systems (regulation valves, lubrication system, etc.) on frame
Item no.: X14522-1
login
You must be logged in to use this functionality.
It is not possible to bid on this machine at this moment
* Bids and limits plus commission and vat
There will be no delivery. Assets are sold as is/where is. For your calculation please keep in mind the additional cost for removal, transportation, insurance and so on.
* Bids over € 5.000 are accepted with Bank Certificate (this also applies to further auctions).
-
Details Backpressure turbine with a generator and auxiliary systems (regulation valves, lubrication system, etc.) on frame