- Description
- we are selling a full featured 3S-Turnkey PV Module Factory
Short business description
The ASolar plant started in 2011, planned for an output of up to 35-40 MW/year of PV Modules. The 1.800 m2 industrial plant are rented. Holding meanwhile an 70 MW/year 3S turnkey PV Module Factory. The factory mainly produced 60/72 Cells Modules and even various Glas/Glas Modules. Also an upgrade kit for 5 BB is located on site.
Production capacity
Uptime of 95% : 70 MW/year (calculation based on 360 days) Ugraded with Laminator type 3S NG3622XL the the capacity can be increased up to 100 MW/year
Business Opportunities
high potential for adjustments
low labor costs
Investor-Friendly Environment
refundable and non-refundable investment incentives
cash subsidies
tax incentives
ATTENTION: The position "full featured 3S-Turnkey PV Module Factory" contains positions from X14357-350 to -382. The reception of the offer will be awarded on the condition that the highest bid on this position is higher than the sum of the highest bids on the positions X15346-260 bis -335. - by order of:
- NetBid GmbH (Austria)
*** ended *** full featured 3S-Turnkey PV Module Factory
PreviousAuction Type
Trading Premium- ends:
- 20/01/2020
11:00 - number of bids:
- 0 Bids
- Status:
- Trading closed
- Item no.:
- X14357-1000
- surcharge
- 15.00%
full featured 3S-Turnkey PV Module Factory
Item no.: X14357-1000
login
You must be logged in to use this functionality.
It is not possible to bid on this machine at this moment
* Bids and limits plus commission and vat
There will be no delivery. Assets are sold as is/where is. For your calculation please keep in mind the additional cost for removal, transportation, insurance and so on.
* Bids over € 5.000 are accepted with Bank Certificate (this also applies to further auctions).
-
Details full featured 3S-Turnkey PV Module Factory
-
Contact
Joachim Mink, Tel. +49 172 755 65 76, Email: mink@netbid.com