Venta en linea

Methanol Plant with possible upgrade to Bio-Methanol production.

Lugar

Methanol Plant with possible upgrade to Bio-Methanol production.
Liberty Two Methanol LLC
400 Capitol Street
Charleston, West Virginia, 25301 (USA)

Location: Lendava (Slovenia)

abrir en google maps

Methanol Plant with possible upgrade to Bio-Methanol production.

Methanol Plant with possible upgrade to Bio-Methanol production.

Número de oferta: 15622

3er trimestre 2020

    Formatos Oferta

    Proyectos Online

    On behalf of the entitled party we are selling online against highest bid the methanol Plant of the company Liberty Two Methanol LLC.

    3er trimestre 2020

    Ver más fotos de este artículo

    Login

    Usted debe haber iniciado la sesión para poder ultilizar esta función.

    Recomendar

    E-Mail *

    Su mensaje *

    Acordar visita

    Número de oferta:

    15622

    Su mensaje


    Por favor, infórmenos sobre cómo le podemos contactar
    • Detalles

      Viewing:

      Viewing is possible at any time. Please schedule your visit at weiksler@netbid.com.

      The reception of the offer will be awarded with reservation until the approval of the entitled party!

      Online bidding is possible immediately.

      The following item is put up for auction:
      Three integrated units:


      • Unit 100 – Reforming Methane (CH4) and Steam (H2O) into Carbon Monoxide (CO), Carbon Dioxide (CO2), and Hydrogen (H2)

      • Unit 200 – Methanol Synthesis

      • Unit 300 – Distillation (99.96% methanol purity)

      Plant capacity – existing daily capacity with current technology is following :

      • Capacity of the plant in case of usage natural gas as raw material is 450 ton/day or app. 165.000 ton per year;

      • Capacity of the plant in case of usage gasoline as raw material is 540 ton/day or app. 190.000 ton per year.

      Methanol plant has such technology it can use for production of methanol either natural gas or naphtha or any kind of ratio between both raw materials.

      • Methanol plant is in the middle of the guarded industrial zone

      • ARSO decision for recall of IPPC IED permit is valid until June 30, 2021

      Detailed information about the project can be found here.

      To enter the data room, please complete, sign and return the NDA document. You can find the NDA document here.

    • Contacto

      Mr Ales Weiksler (German, English, Slovenian und Serbian speaking)
      phone: +386 40 515 140
      weiksler@netbid.com