This auction has ended.
Description
Pressure switch for cylinders and manifold up to the first flange (incl. lower half of the flange) as well as red mounting frame for the cylinders from the areas of EDP engraving; tank storage EDP room; operating capsule machine 8, operating capsule M7 + switch rooms M6/ M7
3 pipe pots and distributor flaps respectively as well as 1 switch cabinet each from the areas of operating capsule machine 8 and operating capsule M7 + switch rooms M6/ M7
Disassembly possible approx. 2 March 2012
The buyer undertakes to ensure that the electrical and software decommissioning of the systems is carried out by the specialist company Total Walther at his expense.
3 pipe pots and distributor flaps respectively as well as 1 switch cabinet each from the areas of operating capsule machine 8 and operating capsule M7 + switch rooms M6/ M7
Disassembly possible approx. 2 March 2012
The buyer undertakes to ensure that the electrical and software decommissioning of the systems is carried out by the specialist company Total Walther at his expense.
Location
- Hamburg
Parts of this page have been machine translated. The German original text applies.
Your individual consultation
Our experts will be happy to advise you. Call +49 40 355059-132 or write to service@netbid.com


