Part of the Auction Spheroidizing Annealing Furnace from NANO Automotive in Spain
Spheroidizing Annealing Furnace SHINJIN FURNACE HT-SPHAN-CO-BARO
Trading #18871-1
Details
Product Type
SHINJIN FURNACE
Type
HT-SPHAN-CO-BARO
Construction Year
2019
Description
SN HT-AN-CO-BARO-B18228-001; Spheroidizing Annealing Furnace for Cold Forging Products
Driving method:
· Hearth roller type driving system (Hearth Roller Type Driving System)
· Operating temperatures:
Heating zone:
Normal: 785 °C
Maximum: 850 °C
· Slow cooling zone:
Normal: 720–680 °C
Maximum: 750 °C
. Treatment capacity:
1,538 baskets per hour (~1,250 kg/h)
39 minutes per basket
Gross weight per basket: 1,380 kg
· Power:
Heating: 3Ph × 400V × 50Hz
Control: 3Ph × 220V × 50Hz
· Effective size: 32400 x 1400 x 505 mm
· Temperature control:
· S.C.R. P.I.D. control system
· Permissible temperature deviation:
Heating: 785 °C ±5 °C
Slow cooling: 720 °C ±5 °C
· Basket dimensions: 1250 × 1250 × 400 mm
13 Heat Treatment Zones:
· Heating/Soaking zones: 5 zones (1Z–5Z)
· Cooling zones: 2 zones (6Z, 7Z)
· Slow cooling zones: 6 zones (8Z–13Z)
**Process durations:**
· Heating / Soaking: 344 minutes
· Cooling: 60 minutes
· Slow cooling: 400 minutes
· Rapid cooling (to below 200 °C): 39 minutes
· Total cycle time: 870 minutes
CE standards
Approximate dimensions: 50.000 x 7.500 x 4.650 mm
Driving method:
· Hearth roller type driving system (Hearth Roller Type Driving System)
· Operating temperatures:
Heating zone:
Normal: 785 °C
Maximum: 850 °C
· Slow cooling zone:
Normal: 720–680 °C
Maximum: 750 °C
. Treatment capacity:
1,538 baskets per hour (~1,250 kg/h)
39 minutes per basket
Gross weight per basket: 1,380 kg
· Power:
Heating: 3Ph × 400V × 50Hz
Control: 3Ph × 220V × 50Hz
· Effective size: 32400 x 1400 x 505 mm
· Temperature control:
· S.C.R. P.I.D. control system
· Permissible temperature deviation:
Heating: 785 °C ±5 °C
Slow cooling: 720 °C ±5 °C
· Basket dimensions: 1250 × 1250 × 400 mm
13 Heat Treatment Zones:
· Heating/Soaking zones: 5 zones (1Z–5Z)
· Cooling zones: 2 zones (6Z, 7Z)
· Slow cooling zones: 6 zones (8Z–13Z)
**Process durations:**
· Heating / Soaking: 344 minutes
· Cooling: 60 minutes
· Slow cooling: 400 minutes
· Rapid cooling (to below 200 °C): 39 minutes
· Total cycle time: 870 minutes
CE standards
Approximate dimensions: 50.000 x 7.500 x 4.650 mm
Location
- 31500 Tudela, Navarra
Dates
Inspection
Visits are only possible after prior registration at fernandez@netbid.com.
Pickup
Collection is only possible after prior registration at fernandez@netbid.com.
Auction Terms
Special conditions:
- Available loading facilities on-site: cranes (loading capacity 5 t and 16 t), loading ramp. Please contact our collague on the location site for more details, if needed.
- Protection shoes and reflective vest are mandatory for the visit.
- A knockdown is possible immediately upon bid acceptance.
- The collection must be completed no later than on 20.12.2025.
- Available loading facilities on-site: cranes (loading capacity 5 t and 16 t), loading ramp. Please contact our collague on the location site for more details, if needed.
- Protection shoes and reflective vest are mandatory for the visit.
- A knockdown is possible immediately upon bid acceptance.
- The collection must be completed no later than on 20.12.2025.
Contact Person
Parts of this page have been machine translated. The German original text applies.
Your individual consultation
Our experts will be happy to advise you. Call +49 40 355059-132 or write to service@netbid.com